GPNS has a been known in the construction business for the contribution it has provided in construction and maintenance of bridges throughout the territory of Nepal. Some of the on-going bridge projects owned by GPNS is as listed below.

                                                                                                                                       Bridge Projects
S.No Description of Works Client Project Period Total Contract Amount (Excluding VAT) Total Contract Amount (Including VAT) Percentage Completed
1 Design and Built of Arch Bridge at Sunkoshi River, Fokshingtar, Udaypur Bridge Project, Department of Roads, Babarmahal, Kathmandu 36 Months    196,009,941.81    221,491,234.25 15%
2 Design and Built of  Bridge at Marsyangdhi Turture Gorkha Department of Roads, Bridge Branch, Patan Dhoka, Lalitpur 36 Months      61,540,000.00      69,540,200.00 28.50%
3 Design & Build of  Seti River , Yamdi Bridge Branch, Chakupat, Lalitpur 36 Months      85,969,440.00      97,145,467.20 Recently Awarded
4 Design & Build of  Sani Bheri River
Bridge Kuna Khet, Pipal VDC and Syalapakha VDC
Bridge Branch, Chakupat, Lalitpur 36 Months      83,223,720.00      94,042,803.60 Recently Awarded
5 Design & Build of  kaligandaki River Bridge in between Puttarghat Tanahu and Palpa Dor, bridge Branch, Chakupat, Lalitpur 36 Months      10,980,000.00      12,407,400.00 Recently Awarded
6 Yogmaya Shaktipith Suspension Bridge, Bhojpur, Sankhuwasabha Ministry of Local Development, Local Development and Agricultural Road Division, Department of Suspension Bridge Division, Pulchowk, Lalitpur 18 Months      11,884,000.00      13,428,920.00 Recently Awarded
7 Jamughat Multispan Suspension Bridge, Surkhet Suspension Bridge Division, Pulchowk, Lalitpur 18 Months      52,491,837.37      59,315,776.23 Recently Awarded
8 Construction of Suspension Bridge at Nishi Khola, Baglung and Chhipeghat, Syangja Suspension Bridge Division, Pulchowk, Lalitpur 18 Months      31,400,000.00      35,482,000.00 90%
9 Construction of Suspension Bridge at Bangsing, Gorkha Suspension Bridge Division, Pulchowk, Lalitpur 18 Months        38,900,000.00      43,957,000.00 85%